MEINHARDT (HONG KONG) LTD

Registered Principals:

Laurie Smith, Wai-ho Wong, Chi-kwong Wong, King-won Kwan, Shu-hung Lau, Reuben Chu, Chris Sparrow, John Berry, Koon-hoi Siu, Martin Harris, Helen Cochrane, Alan YL Wan

Address:

4/F Wah Ming Centre, 421 Queen's Road West, Hong Kong

Telephone:

2858 0738

Facsimile:

2559 1613

E-mail :

mcehk@meinhardt.com.hk

Web-site:

www.meinhardtgroup.com

 

 

Directors

Laurie Smith

BTech, CEng, FCIBSE, MHKIE, MIEAust, RPE

WH Wong

BSc(Eng), CEng, FIEE, FCIBSE, FHKIE, MIEAust, RPE

CK Wong

BSc(Eng), MBA, CEng, MIMechE, MIEE, FCIBSE, FHKIE, MIEAust, RPE, MASHRAE

KW Kwan

BSc(Eng), CEng, MIMechE, MCIBSE, MHKIE, RPE

SH Lau

BSc(Eng), CEng, MIEE, MCIBSE, MHKIE, RPE

Reuben Chu

MSc(Eng), CEng, FHKIE, FICE, FIStrutE, FHKIHT, FIHT, FGS, , MIMM, RSE1-PRC, RSE, RPE

Chris Sparrow

BSc, CEng, MICE, FIEAust, FHKIE, RSE, RPE

Koon-hoi Siu

BSc(Eng), CEng, FHKIE, MIStrutE, RPE, AP, RSE

Helen Cochrane

BSc, MSc, MCIWEM, EARA, MIEnv.Sc., MIEMA, MHKWMA

Mark Lomas

BSc, CEng, MHKIE, MStructE, RPE

Nick Organ

 

Alan YL Wan

BSc(Eng), CEng, RPE, MICE, MIStructE, MHKIE, FHKIHT, MIHT, MASCE, 1RSE-PRC

 

 

Technical Directors / Associates

Joseph Chow

EndCert(Refrig), HC(Mech), MASHRAE

George Doyle

BSc, CEng, MCIBSE, MHKIE, MASHRAE, RPE

Wong Wai Hing

CEng, MIStructE, MHKIE, RSE, RSE1-PRC, RPE

John Berry

BE, MHKIE, MIEAust, MASCE, ACIArb, FHKIHT, MIHT, RPE

Jackie Yeung

BSc(Eng), MBA, MHKIE, PEng(Ont) , RPE

NM Cheung

BSc(Eng), CEng, MIEE, MHKIE, RPE

Aldows Tang

BE, CEng, MIStructE, MHKIE, RPE

Paul Yau

BSc, MEng, CEng, MICE, MHKIE, MIStructE, RPE

Roger Everson

FRICS, ACIArb, MACostE, HKIAC Accredited Mediator

Martin Harris

BSc(Eng), CEng, MICE, MHKWMA

Simon Illingworth

BSc(Eng), CEng, MICE

KK Lam

BSc(Eng), MIEAust, MHKIE, MICE, ACIArb, CEng

YW So

BSc(Eng), MSc, CEng, MIStructE, MHKIE, RPE, RSE

MW Tong

BSc(Eng), CEng, MCIBSE, MHKIE, RPE

Mark Avery

MIEE

 

 

General Description

Meinhardt is an international multi-disciplinary consulting engineering practice employing more than 1,500 staff with offices throughout Asia, Australia, China, United Kingdom and United States of America.  Meinhardt Hong Kong began operation in 1974 and now employs almost 550 technical staff, including skilled and experienced multi-disciplinary engineers, technicians, computer and CAD personnel and support staff.  The company provides services to government bodies and agencies, private developers, industry and commerce, Institutions, public transportation and utilities enterprises. 

 

 

Personnel

Hong Kong Office

Engineers

297

Technicians / CAD Draughtsmen

95

Administrative Staff

72

Other Regional Offices

Australia

300

Asia

550

China

85

UK / USA

35

 

 

Services

Services provided range from Feasibility Study to Full Design, Project Design and Construction Management; including ¡X

  • Feasibility Studies
  • Environmental Investigations
  • Economic Studies
  • Masterplans
  • Detailed Design
  • Tender Negotiations
  • Supervision/Management of Construction
  • Programming
  • Quality Assurance & Control
  • Procurement
  • Commissioning
  • Post Completion Audits
  • Total Plant Management
  • Value Engineering
  • Energy Audit
  • Independent Checking and Engineering Audit
  • Construction Disputes
  • Quantity Surveying
  • Supplier Assessment

 

 

Fields of Specialisation

Specialised in all engineering disciplines including ¡X

  • Geotechnical
  • Civil
  • Structural
  • Infrastructure
  • Mechanical and Electrical
  • Hydraulics and Fire
  • Building Services
  • Project Management
  • Building Facades
  • Aviation
  • Information Technology
  • Environmental
  • Seismic
  • Water Supplies
  • Waste and Sewage Treatment
  • Acoustics
  • Facilities
  • Flood Relief and Coastal/River Management
  • Power Station Development
  • Solid Waste Management
  • Dispute Management

Expertised in full range of projects including ¡X

  • Buildings of all types
  • Highways, Transportation, Bridges and Tunnels
  • Slope stability and retention
  • Ports/marine facilities
  • Airport facilities
  • Railway facilities
  • Healthcare facilities
  • Recreation facilities
  • Theme parks
  • Education facilities

Typical Projects

Hong Kong

  • 35 Clearwater Bay Road Development ¡V Site Area 21,700m2
  • HAECO Aircraft Maintenance Hangar No. 2 ¡V 3 bay heavy maintenance hangar
  • 16 Westlands Road Redevelopment, Quarry Bay ¡V 69 storeys office buildings
  • Enterprise Square V ¡V GFA 155,000m2
  • Bank of China Tower, Central ¡V GFA 10,700m2
  • One International Finance Centre, Central - GFA 85,050m2
  • Caroline Centre, Yun Ping Road - GFA 60,000m2
  • Devon House, Quarry Bay ¡V GFA 90,000m2
  • Lantau & Airport Railway - HK Station, Siu Ho Wan Depot, Olympic Station, Tunnels between Taikoktsui and Kowloon
  • CX City - CPA Headquarters and Crew Hotel; Flight Training Centre and Airline Store Building
  • HAECO Large Aircraft Engine Test Cell, Strip & Build Workshop at TKO ¡V GFA 6,200m2
  • HAECO Aircraft Engine Overhaul Facility Tseung Kwan O
  • HAECO Base & Line Maintenance Projects at Chek Lap Kok
  • Lufthansa Inflight Catering Facility at Chek Lap Kok
  • MTRC TKE Line - Yau Tong Station and Tseung Kwan O South Station
  • Plaza Hollywood and Galaxia, Diamond Hill ¡V GFA 180,000m2
  • Tierra Verde & Maritime Square, LAR Tsing Yi Station ¡V GFA 342,000m2
  • Harbourfront Landmark, Hung Hom ¡V GFA 62,500m2
  • Cambridge House, Quarry Bay ¡V GFA 25,237m2
  • Oxford House, Quarry Bay ¡V GFA 54,000m2
  • DCH Commercial Building, Quarry Bay ¡V GFA 26,000m2
  • 1063 King's Road, Quarry Bay ¡V GFA 27,000m2
  • The Victoria Towers, Tsimshatsui ¡V Site Area 10,486m2
  • Ocean Shores, Tseung Kwan O ¡V GFA 375,000m2
  • The Pinnacle, Tseung Kwan O
  • KCRC East Rail Extension, Tsim Sha Tsui Line - Hung Hom Station & Homantin Substation
  • KCRC Lo Wu Station Improvement Works
  • KCRC Fo Tan, University, Fanling and Taipo Stations Improvement Works
  • KCRC Shatin to Central Link - Contract No. SDC700 - Admiralty to Central West
  • KCRC Shatin to Central Link - Contract No. SDC400 - Hunghom Mass Transportation Centre
  • Hong Kong International Airport East Hall Extension
  • DHL Central Asia Hub
  • Hong Kong Science Park Phase 2
  • Ecological Monitoring of Uncontaminated Dumping Ground, and Contaminated Mud Pits at East of Sha Chau
  • Environmental Project Office and Independent Environmental Checker for the Infrastructure Development for the Hong Kong International Theme Park at Penny's Bay
  • Environmental Impact Assessments for Projects such as Permanent Aviation Fuel Facility, Yung Shue Wan Reclamation, Castle Peak Road Improvement, Backfilling of Marine Borrow Area, Tung Chung Road Improvement, Lantau North South Road Link, North Tsing Yi and Pak Shek Kok Reclamations
  • Baseline Monitoring and Performance Verification of the SSDS Interim Outfall at Stonecutters Island
  • Performance Assessment of the Tolo Effluent Export Scheme
  • Environmental and Engineering Feasibility Studies of the Way Forward of the Harbour Area Treatment Scheme
  • Management of Chemical and Biological Testing for the New Sediment Classification Framework
  • Study of Biological Indicators
  • Rural Drainage Rehabilitation Scheme - River modelling, flood alleviation planning and design
  • Crosslinks Study, Stages 1&2 - Environmental & Engineering study of cross border links
  • Tolo Harbour Sewerage Phase 1 Stage II - Provision of sewerage to 43 village in Tolo Harbour area
  • RPIS Rural Improvement Packages 1,2,3 & 5 - 85 separate projects covering roads, bridges, river training work & piers
  • Museum of History - a prestige exhibition centre forming a landmark at Tsimshatsui East
  • Restoration of Historical Building - design and supervision of the old Mental Hospital at High Street, relocation of Murray Building to Ma Hang, Stanley, conversion of the Police Station to Welcome Supermarket at Stanley, and repair to the Western Market for URA
  • New International School for English School Foundation at Ma On Shan, Extension of Lingnan University, School Improvements Package 7 of Final Phase, and a number of self-delivery mode school improvement projects
  • NENT Landfill - EIA, design and supervision
  • Kowloon Bay, Shatin, NWNT, Island East, West Kowloon, Island West, and Outlying Islands Refuse Transfer Stations
  • Black Point Power Station - Design and supervision of construction of 2400MW CCGT station
  • West Kowloon and Kwai Chung Reclamation - Design of marine and infrastructure works
  • SENT Landfill - Independent checking engineer
  • Yue Yang Power Station, Daya Bay and Ling Ao Nuclear Power Stations in PRC
  • Sham Tseng Link - major feasibility study for 10km highway including a large channel crossing
  • Castle Peak Road Improvement - design and construction supervision of 10km dual two lane highway
  • Railway Development Study - independent assessment of preliminary designs
  • Central Kowloon Route, Justice Drive Extension - design and construction supervisions
  • Shenzhen to Tai Po Submarine Gas Pipeline
  • Hong Kong ¡V Zhuhai ¡V Macau Bridge ¡V Ecological Baseline
  • Improvement to Castle Peak Road between Ka Loon Tsuen and Siu Lam

Regional

  • Avic Plaza, Shenzhen ¡V 280 metre tall office tower and site area 17,000m2
  • Peninsula Hotel, Shanghai ¡V 250-room hotel and 16 storey serviced apartment
  • Hotel and Casino, Macau ¡V 4000-room hotel and 1000 staff quarters flat
  • Legend Hotel, Beijing ¡V 550-room hotel and 380-room apartment
  • Taikoo Hui ¡V Guangzhou Cultural Plaza ¡V GFA 366,000m2
  • Shangri-La Hotel, Chengdu, Ningbo, Qingdao, Fuzhou, Zhong Shan, Guilian, Hohhot and Bautao ¡V Over 2000-room hotel
  • Peninsula Hotel, Bangkok ¡V 40 storey 450-room
  • Renaissance Riverside Hotel, Ho Chi Minh City, Vietnam ¡V 350-room 5-star
  • World Trade Centre, Colombo, Sri Lanka ¡V 40 storey twin office-tower with 4 storey commercial lower block and one 3 storey podium of total GFA 114,400m2
  • Shanghai Square ¡V Huai Hai Chung Lu, Shanghai, P.R.C. - 60,000m2 development including food court, ice skating rink, commercial shops and an office tower
  • Shanghai Unilever Detergent Manufacturing Complex ¡V 5 storey Process building and a 3,400m2 GFA RC construction Warehouse Building, a 2-storey Amenity/Office Building and a Chemical Tank Farm
  • Grand Hyatt, Jakarta ¡V 484 room 5-star hotel plus 65,000m2 retail
  • Pontiac Marina, Singapore ¡V 2 5-star hotel, 1 37-storey and 1 42-storey office buildings, retail
  • Hua Wei Production Base, Hangzhou, PRC ¡V GFA 70,000m2
  • Qingdao Shangri-La Hotel, PRC ¡V 500-room
  • Environmental monitoring, audit and air pollution modelling for offshore gas platform in Thailand
  • New World Plaza Nanjing PRC - Design of a twin 46 storey office, hotel and retail development